Industrial Insights
Industry developments, technical guidance, product knowledge and procurement insights for contractors, EPC teams and industrial buyers.
L&T's M&M Division Secures EPC Order for 850 KTPA Alumina Refinery in Odisha
The Minerals & Metals (M&M) business vertical of L&T secured an order from Hindalco for setting up an 850 KTPA (kilo tonne per annum) greenfield alumina refinery plant in Odisha.…
MODEC Awarded Offshore Carbon Capture FEED Contract with SAMSUNG E&A
MODEC has entered into a Front End Engineering and Design (FEED) contract with SAMSUNG E&A for an offshore carbon capture pilot project, selecting Carbon Clean’s modular CycloneCC technology. The study…
Worley to Lead Integration for Rincon Mining’s Lithium Project in Argentina
Rincon Mining recently named Worley as the Lead Integration Delivery Partner for its new lithium project in Argentina. With a total investment of more than $2 billion USD by Rio…
Wood secures $120 million engineering contract extension with Shell UK
Wood Group PLC has been awarded a $120 million contract extension by Shell UK Limited to provide brownfield engineering, procurement and construction (EPC) to onshore and offshore assets across the UK.…

Wood Awarded FEED Contract for Zeevonk Hydrogen Facility in the Netherlands
Wood has been awarded the front-end engineering design (FEED) scope for the Zeevonk hydrogen facility, in Rotterdam, Netherlands. The hydrogen plant will be powered by offshore wind and floating offshore solar from…
SBM Offshore awarded a study by Petrobras for FPSO CO2 Carbon Capture Solution
SBM Offshore announced the signature of a study with PETROBRAS for the application of Carbon Capture Modules on FPSOs. The module design is based on a successful engineering and design…
Worley Awarded FEED Contract by First Ammonia for Electric Ammonia Facility in Texas
We’ve been selected by First Ammonia to deliver the front-end engineering design (FEED) for an electric ammonia facility in Victoria, Texas. This facility has an initial anticipated production capacity of…
Aker Solutions & SLB Capturi awarded contract for Hafslund Celsio’s CCS Project
Aker Solutions and SLB Capturi have been awarded a contract for the carbon capture and storage solution at Hafslund Celsio’s waste-to-energy plant in Oslo, Norway. The contract will deliver a carbon…
IKPT and Consortium Partners Secure EPC Contract for Muara Laboh Geothermal Power Plant Expansion
PT Inti Karya Persada Tehnik, a subsidiary of Toyo Engineering Corporation, together with its consortium partner Sumitomo Corporation and PT Wasa Mitra Engineering, has signed an Engineering, Procurement, and Construction…